Industrial
Prest-Tech Construction has built its foundations on building and refurbishing single and double span portal frame buildings.
Tile Mart - Chorley Old Rd, Bolton
This flagship 10,000 sq/ft retail ceramic tile showroom was built and handed over to Tile Mart on time and budget.
Tile Mart Finished Gallery
Al Murad Tile Warehouse
Pres-Tech Construction was awarded the design and build contract for this 20,000 sq/ft extension to Al-Murads existing 60,000 sq/ft central distribution depot. The project was completed on time and budget.
Al Murad Finished Gallery
Residential
Beechfield House - Eccles, Manchester
Project- Conversion Of Existing Building Into 5 Apartments With A Timber Frame Side Extension Consisting Of 6 Apartments. A Mixture Of 2 Bedroom And Duplex Apartments.
Beechfield House Finished Gallery